Practical Advice: COVID-19's Impact on the Construction Industry

Client Alert

As a member of the American Bar Association, Forum on the Construction Industry, BMD participated in a COVID-19 Construction Leadership Roundtable discussion with over 450 other construction attorneys representing nearly every voice in the industry. Here is the top practical advice and key takeaways: 

  1. Safety. Safety is the overriding imperative on all construction projects. Employers should designate and empower a COVID-19 Compliance Coordinator and post on site the CDC guidelines in English and other appropriate languages. The six-foot social distancing requirement, portable handwashing, wearing gloves, prohibiting carpooling to the jobsite, and closing jobsites to the public are now considered best practices and mandatory expectations for all employers. In some states, governmental agencies are spot checking jobsites and removing individuals who are not in compliance with the CDC guidelines. The Occupational Safety and Health Administration has issued guidance for protecting employees against workplace exposures to COVID-19. Employers should also be aware of OSHA standards which may apply to workplace exposures and when a case of COVID-19 is OSHA recordable. Learn more here from BMD’s March 20, 2020 OSHA and COVID-19: Workplace Exposures, Citations and Recording Client Advisory. 
  1. Notice. Give notice early and often! After providing notice, follow up with timely reports, cost information and detailed schedule impact data. Maintain detailed records if you want to preserve any chance of recovering for delay impacts. It is not enough to generally argue that your work has been delayed by COVID-19. It must be written in a way to prevent or discourage escalation, including litigation. Be prepared to demonstrate how and when delay impacts occurred, such as utilization of a measured mile analysis to prove loss of efficiency and productivity. Helping the owner or general contractor understand the unique circumstances which caused the delay will increase your chances to cooperatively resolve the problem. 
  1. Suspension or Termination of Work. Suspension or termination of work remains an option on a case-by-case basis. Work is generally proceeding but is being impacted by CDC guidelines. Each project is unique and requires the owner’s willingness to work with prime contractors, subcontractors, suppliers, and design professionals. It has been rare for attorneys to counsel clients to stop work. There have been some suspensions of work, but often work resumes if employers and workers take appropriate CDC precautions. For example, work is proceeding at the City of Tampa, Florida airport where virtual inspections are being conducted by using affidavits, video or digital images, or in-person inspections per CDC guidelines. Some third-party inspections have been allowed and some government agencies are deferring inspections. Materials onsite are being sanitized. By contrast, due to the large number of coronavirus cases in New York and New Jersey, most private and public construction projects in those areas have been shut down. 
  1. Collaboration. Because the phrase “unchartered waters” does not begin to describe the impact that COVID-19 is having on construction projects, the best advice for prime contractors and subcontractors is to try to row in the same direction. This is no time for battles or disputes between general contractors and subcontractors. Prime contractors should ascertain the cash flow status of their subcontractors to determine whether they will be able to perform under the current revenue-starved environment. A key element for project success is that all parties need to work together to identify risks, loss of productivity, schedule impacts, supply chain issues, safety issues, etc. In fact, it has been perceived that many owners are being more forgiving on product substitutions and developing creative solutions to deal with impacts resulting from coronavirus delays – so take advantage of it while you can by being collaborative! 
  1. Liquidated Damages, Force Majeure, and Excusable Delays. How courts will interpret construction contract delay clauses, force majeure clauses and common law rights with respect to the delay impacts associated with COVID-19 remains to be seen, and it will likely be determined on a case-by-case basis. Because many courts are holding civil disputes in abeyance, immediate relief from the judicial system is unlikely. For this reason, as well as solid business judgment, it makes good sense for the parties to cooperatively engage in direct and timely discussions regarding how to proceed with construction and manage delay impacts in a mutually beneficial way. Issuance of change orders or schedule extensions may relieve some of the time and cost impacts. Prudent owners welcome timely notice because they can attempt to manage these issues and risks. Excellent communication is the key to identify problems. Deliver timely written notice and detailed substantive documentation, offer creative solutions, and try to manage the difficult circumstances together. Rather than pulling the trigger on default clauses, it is generally advisable to push across the project finish line and properly document all cost and time impacts. As we advised in the BMD Client Advisory on March 17th, the extent to which COVID-19 excuses or extends contractual obligation(s) is a fact-specific determination that will depend on the nature of the obligations and the specific language of the contract. 
  1. Project Financing. “Cash is king,” and if the availability of private and public funding is impaired, work may cease and sureties may be required to take over on payment and performance bonded projects. Conduct adequate due diligence before committing to business relationships. On an ongoing basis, be sure to request and receive adequate assurances of financial ability to pay whenever possible. 

Please feel free to reach out to Bob Hager, Justin Alaburda, David Scott, Jeff Miller, Steve Matasich or Brandon Pauley if you have any questions or comments on these issues. This is intended as general advice and should not be interpreted as legal advice. Each situation is unique and requires specific analysis of relevant contracts, facts and legal obligations.


What Happens to a Pandemic Stimulus Payment Upon Death?

On January 1, 2021, the federal government issued stimulus payments (also known as Economic Impact Payments) to American citizens – on paper. However, many of the stimulus payments were not received until several months later. Sometimes the stimulus payments did not arrive until after an individual died.

The Masks Are Back: New OSHA Regulations for Healthcare Employers

Employment Law After Hours is back with a News Break Episode. Yesterday, OSHA published new rules for healthcare facilities, including hospitals, home health employers, nursing homes, ambulance companies, and assisted living facilities. These new rules are very cumbersome, requiring mask wearing for all employees, even those that are vaccinated. The only exception is for fully vaccinated employees (2 weeks post final dose) who are in a "well-defined" area where there is no reasonable expectation that any person with suspected or confirmed COVID-19 will be present.

New OSHA Guidance for Workplaces Not Covered by the Healthcare Emergency Temporary Standard

On June 10, 2021, OSHA issued an Emergency Temporary Standard (ETS) for occupational exposure to COVID-19, but it applies only to healthcare and healthcare support service workers. For a detailed summary of the ETS applicable to the healthcare industry, please visit https://youtu.be/vPyXmKwOzsk. All employers not subject to the ETS should review OSHA’s contemporaneously released, updated Guidance on Mitigating and Preventing the Spread of COVID-19 in the Workplace. The new Guidance essentially leaves intact OSHA’s earlier guidance, but only for unvaccinated and otherwise at-risk workers (“at-risk” meaning vaccinated or unvaccinated workers with immunocompromising conditions). For fully vaccinated workers, OSHA defers to CDC Guidance for Fully Vaccinated People, which advises that most fully vaccinated people can resume activities without wearing masks or physically distancing, except where required by federal, state, or local laws or individual business policies.

Employer Liability for COVID-19 Vaccine Side Effects

As employers encourage or require employees to obtain a COVID-19 vaccine, they should be aware of OSHA recording obligations and potential workers’ compensation liability. Though OSHA has yet to revise its COVID-19 guidance in response to the latest CDC recommendations, OSHA has revised its position regarding the recording of injury or illness resulting from the vaccine. Until now, OSHA required an employer to record an adverse reaction when the vaccine was required for employees and the injury or illness otherwise met the recording criteria (work-related, a new case, and meets one or more of the general recording criteria). OSHA has reversed course and announced that it will not require recording adverse reactions until at least May 2022, irrespective of whether the employer requires the vaccine as a condition of employment. In its revised COVID-19 FAQs, OSHA states:

The New Rule 1.510 - Radical Change for Summary Judgement Procedure in Florida

In civil litigation, where both sides participate actively, trial is usually required at the end of a long, expensive case to determine a winner and a loser. In federal and most state courts, however, there are a few procedural shortcuts by which parties can seek to prevail in advance of trial, saving time, money and annoyance. The most common of these is the “motion for summary judgment”: a request to the court by one side for judgment before trial, generally on the basis that the evidence available reflects that a win for that party is legally inevitable and thus required. Effective May 1, 2021, summary judgment procedure in Florida has radically changed.